Skip to content
Ground-mounted solar park at dusk

Solar Infrastructure, Delivered

Selected projects from a track record of 10 GW+ across 15 countries - from industrial rooftops to utility-scale solar parks.

Projects

Engineered, Built, and Operated by ENSOOL

51 MW Groningen, Netherlands

One of Northern Europe's significant PV deployments, this 51 MW installation showcases ENSOOL's capability to manage large-scale logistics and rapid structural mounting.

Completed in 2025, the project required complex soil analysis and specialized foundation ramming due to the regional landscape - with the site layout optimized for a high performance ratio despite lower solar radiation intensity.

51 MW ground-mounted solar park in Groningen, Netherlands

Key Facts

  • Utility-scale ground-mounted installation, completed 2025
  • Renewable electricity for over 14,500 Dutch homes annually
  • Integrated with local grid buffering for maximized stability
  • Installed within a single season, grid-ready ahead of schedule
Request a project

6 MW Nuremberg, Germany

A 6 MWp free-field solar plant near Nuremberg, demonstrating high-efficiency grid integration in Southern Germany.

Initiated in early 2025, this project focused on maximizing yield in a topographically constrained area - full mechanical installation and electrical commissioning to strict local grid requirements.

Free-field solar plant under construction near Nuremberg

Key Facts

  • 6 MWp free-field installation, precision construction
  • ~2,900 tons of CO2 emissions saved annually
  • Powers approx. 1,800 medium-sized households for a full year
  • High-efficiency grid integration in Southern Germany
Request a project

6 MW Tracker Park, Austria

Scheduled for completion in 2026, this "6MW-Tracker" project represents the next step in ENSOOL's innovation roadmap.

By following the sun's path, the single-axis tracking system optimizes the LCOE (Levelized Cost of Energy) and demonstrates our expertise in moving solar structures and high-precision sensors.

Single-axis tracker solar field in Austria

Key Facts

  • Monocrystalline modules with single-axis horizontal tracker
  • Up to 20% higher energy yield than fixed-tilt systems
  • Powers 2,100 households on a minimal land footprint
  • Offsets over 3,400 tons of CO2 annually
Tracker technology

2 MW Rooftop, Stuttgart, Germany

A landmark rooftop project in Germany's industrial heart - transforming unmanaged industrial roof space into a high-performance infrastructure asset.

Executed within our proven 2-3 week pure build cycle to minimize on-site disruption, with the entire lifecycle from engineering and procurement to final commissioning managed in-house.

2 MW rooftop solar installation in Stuttgart

Key Facts

  • 2 MWp industrial rooftop installation, operational
  • 2-3 week pure build cycle, zero disruption for the partner
  • Zero upfront investment through the roof leasing model
  • Long-term contracted energy yield for decades
Request a project
10 GW+Total capacity delivered
15+Countries
195 MWDelivered in a single year
20+Year asset life