
Solar Infrastructure, Delivered
Selected projects from a track record of 10 GW+ across 15 countries - from industrial rooftops to utility-scale solar parks.
Engineered, Built, and Operated by ENSOOL
51 MW Groningen, Netherlands
One of Northern Europe's significant PV deployments, this 51 MW installation showcases ENSOOL's capability to manage large-scale logistics and rapid structural mounting.
Completed in 2025, the project required complex soil analysis and specialized foundation ramming due to the regional landscape - with the site layout optimized for a high performance ratio despite lower solar radiation intensity.

Key Facts
- Utility-scale ground-mounted installation, completed 2025
- Renewable electricity for over 14,500 Dutch homes annually
- Integrated with local grid buffering for maximized stability
- Installed within a single season, grid-ready ahead of schedule
6 MW Nuremberg, Germany
A 6 MWp free-field solar plant near Nuremberg, demonstrating high-efficiency grid integration in Southern Germany.
Initiated in early 2025, this project focused on maximizing yield in a topographically constrained area - full mechanical installation and electrical commissioning to strict local grid requirements.

Key Facts
- 6 MWp free-field installation, precision construction
- ~2,900 tons of CO2 emissions saved annually
- Powers approx. 1,800 medium-sized households for a full year
- High-efficiency grid integration in Southern Germany
6 MW Tracker Park, Austria
Scheduled for completion in 2026, this "6MW-Tracker" project represents the next step in ENSOOL's innovation roadmap.
By following the sun's path, the single-axis tracking system optimizes the LCOE (Levelized Cost of Energy) and demonstrates our expertise in moving solar structures and high-precision sensors.
Key Facts
- Monocrystalline modules with single-axis horizontal tracker
- Up to 20% higher energy yield than fixed-tilt systems
- Powers 2,100 households on a minimal land footprint
- Offsets over 3,400 tons of CO2 annually
2 MW Rooftop, Stuttgart, Germany
A landmark rooftop project in Germany's industrial heart - transforming unmanaged industrial roof space into a high-performance infrastructure asset.
Executed within our proven 2-3 week pure build cycle to minimize on-site disruption, with the entire lifecycle from engineering and procurement to final commissioning managed in-house.

Key Facts
- 2 MWp industrial rooftop installation, operational
- 2-3 week pure build cycle, zero disruption for the partner
- Zero upfront investment through the roof leasing model
- Long-term contracted energy yield for decades